๐CONCRETING OF PLINTH BEAMS ๐
Check List :
1. PCC below plinth beams as per the requirement.
2. Out to out measurements and right angles and internal dimensions.
3. Provision of foundation of stairs from plinth beams.
4. Check for dimensions of Plinth Beams.
5. Check reinforcement details as per RCC drawing and schedule.
6. Ducting if required for all services lines.
7. Quality of shuttering materials.
8. Gaps and joints of shuttering
9. Covering for all sides of beams.
10. Grade of concrete and design mix.
11. Concrete placement and mechanical vibrator / tamping and surface finishing.
12. Marking and finishing of top level of plinth beams.
13. Cubes with identification marks and related slump test.
14. Curing for minimum 10 days.
Records : Consumption record Cube test and related slump.
I hope this check list points will be helpful for every site Engineer.
๐Join Our YouTube Channel Click here
๐Join Our WhatsApp Group Click here
I always Update helpful information and share my practical experience at this site.
Please Give your feedback in comment box.
Comments