Skip to main content

YouTube Videos

Construction and Bar Bending Videos

Construction Site Videos

1. Silicone Filling Process In Gap

2. How to Fill Gap with PU Foam

3. How to Check Level of Shuttering and Slab Casting

4. Brick Coba Work Process

5. RCC Beam Core Cutting

6. How to Measure Guniya

7. Chemical Rebaring Work of Column

8. Trimix Flooring Concrete Procedure OR VDF Flooring

9. Groove Filling Process in Trimix Flooring

10. Densification, Burnishing, Retroplating, Polishing of Concrete Floor

11. Toilet and Kitchen Waterproofing

Bar Bending Schedule Videos

Watch the Bar Bending Schedule Playlist

Comments

Popular posts from this blog

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

Method Of Measurement IS Code

IS 1200 Series Download Links IS 1200 Series: Download Links IS 1200 (Part 1): 1992 – Earthwork IS 1200 (Part 2): 1974 – Concrete Works IS 1200 (Part 3): 1976 – Brickwork IS 1200 (Part 4): 1976 – Stone Masonry IS 1200 (Part 5): 1982 – Formwork IS 1200 (Part 6): 1974 – Roofing IS 1200 (Part 7): 1978 – Woodwork and Joinery IS 1200 (Part 8): 1993 – Steel Reinforcement and Steel Sections IS 1200 (Part 9): 1973 – Structural Steel Work IS 1200 (Part 10): 1973 – Carpentry and Joinery IS 1200 (Part 11): 1977 – Flooring IS 1200 (Part 12): 1976 – Plastering and Pointing IS 1200 (Part 13): 1994 – Whitewashing, Painting, and Polishing IS 1200 (Part 14): 1984 – Pipeline Sewerage IS 1200 (Part 15): 1987 – Glazing IS 1200 (Part 16): 1979 – Water Supply, Sanitary Installations, and Draina...

Social Media