This is the productivity of construction works, including quantity, labor, and duration, which is very helpful information for all site engineers. Productivity, Labor, and Duration for Activities Excavation (Manual) Quantity : 8–10 cubic meters/day per laborer Labor : 10–15 laborers (for larger sites) Duration : As per the area/volume to excavate Mechanical Excavation Quantity : 80–120 cubic meters/day (using an excavator) Labor : 1 operator, 2 helpers Duration : Based on excavation size Manual Backfilling from Available Soil Quantity : 12 cubic meters/labor/day Labor : 6–8 laborers Duration : Based on total area/volume Backfilling from Brought-Out Soil Quantity : 15 cubic meters/labor/day Labor : 5 laborers (excluding transport equipment labor) Duration : Based on volume and transport logistics Sand Filling Quantity : 20 cubic meters/day (manual filling) Labor : 4–5 laborers Duration : Based on area and thickness Anti-Termite Treatment Quantity : 1,000–1,200 square meters/day (spray a...
Welcome to Afroz Civil – your trusted hub for civil engineering knowledge, practical insights, and the latest innovations in construction technology. Our mission is to empower engineers, contractors, and project managers with effective solutions to real-world challenges on construction sites. From theory to practice, we bridge the gap by sharing expert guidance, modern techniques, and proven strategies to ensure smarter, safer, and more efficient project execution.