Create Construction Checklists Instantly Using AI ChatGPT Prompt

Create Site-Ready Construction Checklists Using AI (As per Indian Standard Codes)


I have designed a powerful ChatGPT AI Prompt that helps you generate accurate construction checklists instantly.

👉 Just type the activity name, and the AI will provide a detailed construction checklist strictly aligned with Indian Standard (IS) Codes, site practices, and execution requirements.

🔹 What This AI Prompt Does

  • Generates activity-wise construction checklists

  • Follows Indian Standard Codes (IS)

  • Covers site execution, quality control & safety checks

  • Suitable for real site construction work

  • Saves time and reduces manual errors

🔹 Who Can Use This?

  • Site Engineers

  • Planning & Billing Engineers

  • QA/QC Engineers

  • Project Managers

  • Consultants

  • Civil Engineering Students

🔹 Why Use This AI Checklist Prompt?

✔ Standardized as per Indian codes
✔ Easy to use – only activity name required
✔ Improves site quality & compliance
✔ Helps in professional site documentation

📥 Download the AI Prompt with start to finish project activities name and start creating your real site construction checklists within seconds.

Download Now

🎥 Watch the complete working process by clicking the Play Icon below to see how this AI prompt is used step-by-step for actual site activities.




COMPLETE CONSTRUCTION ACTIVITIES LIST (START TO FINISH)

With AI-Based Site Checklist Generator (As per Indian Standard Codes)

This comprehensive Construction Activities List covers the entire lifecycle of a project — from pre-construction planning to final handover.
Using the Afroz Civil AI Checklist Prompt, you can convert any activity from this list into a professional, site-ready construction checklist as per Indian Standard (IS) Codes.


1. PRE-CONSTRUCTION & PLANNING

  • Feasibility Study & Budgeting Checklist

  • Design Finalization (Architectural, Structural, MEP) Checklist

  • Soil Test / Geotechnical Investigation Checklist

  • Statutory Approvals & Permits Checklist (Local Authority, Environment, Fire, Utilities)

  • Procurement of Materials & Equipment Checklist

  • Mobilization Checklist (Site Office, Fencing, Temporary Utilities)


2. SITE PREPARATION

  • Demolition Checklist (If Existing Structures)

  • Site Clearing Checklist (Vegetation, Debris, Rocks)

  • Site Grading & Leveling Checklist

  • Temporary Roads & Access Routes Checklist

  • Water Supply & Power Supply Arrangement Checklist

  • Setting Out Checklist (Survey, Grid Lines, Benchmarks)


3. EARTHWORK & SUBSTRUCTURE

  • Excavation Checklist (Trenches, Pits, Basements)

  • Dewatering & Soil Stabilization Checklist

  • PCC (Plain Cement Concrete) Checklist

  • Foundation Works Checklist (Isolated / Combined / Raft)

  • Pile Foundation & Pile Caps Checklist

  • Plinth Beam & Damp Proof Course (DPC) Checklist

  • Anti-Termite Treatment Checklist

  • Backfilling & Compaction Checklist

  • Ground Floor Slab / PCC Flooring Checklist


4. SUPERSTRUCTURE

  • Column Layout Checklist

  • Column Reinforcement Checklist

  • Column Shuttering Checklist

  • Column Casting Checklist

  • Column De-shuttering Checklist

  • Column Curing Checklist

  • Beam Reinforcement Checklist

  • Beam Shuttering Checklist

  • Beam Casting Checklist

  • Slab Shuttering, Reinforcement & Casting Checklist

  • Staircase Shuttering, Reinforcement & Casting Checklist

  • Lintel & Chhajja Works Checklist

  • Brickwork / Blockwork Checklist (Internal & External)

  • Scaffolding & Safety Platforms Checklist


5. ROOFING & STRUCTURAL FINISHES

  • Roof Slab Casting Checklist

  • Waterproofing Checklist (Roof & Toilets)

  • Parapet Wall Construction Checklist

  • Terrace Finishing Checklist (Tiles / China Mosaic / Screed)


6. MEP WORKS – ROUGH-IN STAGE

  • Concealed Electrical Conduits & Boxes Checklist

  • Plumbing Pipes Checklist (Water Supply, Drainage, Rainwater)

  • HVAC Ducting & Piping Checklist

  • Fire Fighting System Checklist (Hydrants, Sprinklers, Detectors)

  • Gas Piping / Special Utilities Checklist

  • Earthing Pits & Lightning Arrestors Checklist


7. FINISHING WORKS

  • Internal & External Plastering Checklist

  • Ceiling Finishing Checklist (POP / Gypsum)

  • Floor Screeding Checklist

  • Flooring Checklist (Tiles, Marble, Granite, Epoxy, Wood)

  • Skirting, Dado & Wall Cladding Checklist

  • False Ceiling Framework & Panels Checklist

  • Door & Window Frame Installation Checklist

  • Door, Window & Grill Fixing Checklist

  • Staircase & Balcony Railings Checklist


8. MEP WORKS – FINAL STAGE

  • Electrical Wiring, Switchboards & DBs Checklist

  • Plumbing Fixtures Installation Checklist

  • HVAC Equipment Installation Checklist

  • Fire Fighting Pumps & Equipment Checklist

  • Lift / Elevator Installation Checklist

  • Solar Panels Installation Checklist

  • External Utility Connections Checklist


9. PAINTING & SURFACE FINISHES

  • Wall Putty & Primer Checklist

  • Internal Painting Checklist

  • External Painting & Texture Coating Checklist

  • Wood Polishing & Varnishing Checklist


10. EXTERNAL WORKS & SITE DEVELOPMENT

  • Compound Wall & Entrance Gate Checklist

  • Driveways & Paving Checklist

  • Drainage & Rainwater Harvesting Checklist

  • Septic Tank / STP Checklist

  • Borewell & Pump Room Checklist

  • Overhead & Underground Water Tanks Checklist

  • External Electrical Works Checklist


11. LANDSCAPING WORKS

a) Site Preparation

  • Clearing & Leveling Checklist

  • Topsoil Filling, Manure & Fertilizers Checklist

  • Sloping for Drainage Checklist

b) Hard Landscaping

  • Pathways & Walkways Checklist

  • Garden Kerbs & Edging Checklist

  • Retaining Walls & Planters Checklist

  • Pergolas, Gazebos & Outdoor Furniture Checklist

  • Fountains & Water Features Checklist

  • Outdoor Lighting Checklist

c) Soft Landscaping

  • Lawn / Turf Laying Checklist

  • Tree & Shrub Plantation Checklist

  • Vertical Gardens / Green Walls Checklist

  • Potted Plants Checklist

d) Irrigation & Water Management

  • Sprinkler System Checklist

  • Drip Irrigation Checklist

  • Underground Water Lines Checklist

  • Fountain Pumps Checklist

e) Finishing & Maintenance

  • Mulching, Fertilization & Pest Control Checklist

  • Cleaning of Pathways Checklist

  • Final Landscape Handover Checklist


12. INTERIOR WORKS

  • Modular Kitchen Installation Checklist

  • Wardrobes & Cabinets Checklist

  • Decorative False Ceilings Checklist

  • Wooden Flooring / Vinyl / Carpets Checklist

  • Interior Partitioning & Paneling Checklist


13. TESTING & COMMISSIONING

  • Electrical Load Testing Checklist

  • Plumbing Pressure & Leakage Test Checklist

  • HVAC Air Balancing Checklist

  • Fire Fighting System Testing Checklist

  • Lift Trial Runs Checklist

  • Safety Audits & Inspections Checklist


14. HANDOVER & CLOSEOUT

  • Snag List & Rectification Checklist

  • Deep Cleaning & Waste Disposal Checklist

  • As-Built Drawings Submission Checklist

  • Operation & Maintenance Manuals Checklist

  • Final Joint Inspection Checklist

  • Project Handover Checklist

Thank you for visiting Afroz Civil.
Subscribe and follow us on all our social media platforms for more insights on construction, site execution, Indian Standard Codes, and civil engineering practices.

Afroz Civil
Practical Civil Engineering • Real Site Knowledge

Customer Support Desk- Click Here

Thanks 
Afroz Civil Team

Comments

Popular posts from this blog

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

Types Of Level In Construction

Complete Guide to Construction Levels Complete Guide to Construction Levels with Practical Explanations In construction and civil engineering, different levels are used to ensure proper alignment, stability, drainage, and functionality. Below is a step-by-step explanation of each level in logical order, with practical examples to help you understand them better. 1. Natural Ground Level (NGL) – The Original Surface Definition: The existing level of the ground before any excavation or filling. Practical Example: Imagine you buy land with an uneven surface. The NGL is the starting point before any construction activity. Why It’s Important? Used as a reference for leveling, excavation, and filling. Helps determine how much soil needs to be removed or added. 2. Existing Ground Level (EGL) – After Site Preparation Definition: The level of the ground after site clearing, but before exc...

Social Media