Skip to main content

Rate Analysis of Earthwork

Rate Analysis of Earthwork in Surface Excavation 


DAR 2023 Rate Analysis – Earthwork in Surface Excavation (Item 2.1)

As per Delhi Analysis of Rates (DAR), Volume–01, 2023

Afroz Civil brings you a ready-to-use Excel Rate Analysis Template for earthwork in surface excavation up to 30 cm depth in all kinds of soil, including disposal up to 50 m lead and 1.5 m lift, as per directions of the Engineer-in-Charge.

This template is ideal for BOQ preparation, RA bills, tendering, and running projects.

Derived Rate: ₹106 per SQM (Say)


Key Features

  • DAR 2023 compliant format

  • Auto-calculation in Excel

  • Yellow input cells for easy use

  • Includes labour, water charges & overheads


⬇️ Download Excel Template

👉 Download Rate Analysis of Earthwork in Surface Excavation – Excel Sheet

Price: ₹19 only (Single Sheet)
Enter your site data and get instant, accurate results.

Download Now



If You Find Rate Analysis of Earthwork in Surface Excavation Helpful

Pay ₹49 only and get access to all Rate Analysis Excel Sheets including:

  • Close Timbering

  • Tree Cutting

  • Clearing Jungle

  • Surface Dressing

  • Mechanical Excavation

  • Sand Filling

  • Filling with Available Soil

Practical, editable templates ready for site use.

Download Now




Watch Complete Video on YouTube 👇




Note

All rates of materials, carriage, labour, and equipment shall be considered as per current market rates or the latest applicable SOR / DSR.


Afroz Civil
Practical Civil Engineering • Real Site Knowledge



Comments

Popular posts from this blog

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

Electrical Rate Analysis Excel Toolkit – DAR & CPWD Based BOQ, Estimation & Costing Sheets

  Electrical Rate Analysis Excel Toolkit DAR & CPWD Based Electrical Estimation, BOQ & Costing Templates By Afroz Civil Practical Civil & MEP Engineering Knowledge The Electrical Rate Analysis Excel Toolkit is a professionally designed collection of fully automated Excel templates prepared for electrical estimation, BOQ preparation, costing, billing, tendering, and project planning work. These Excel sheets are developed using practical project requirements and are based on DAR & CPWD standards, making them highly useful for real electrical and MEP projects. This toolkit is specially designed for: Electrical Engineers MEP Engineers Quantity Surveyors Billing Engineers Contractors & Consultants Engineering Students Freshers Preparing for Jobs The toolkit helps engineers perform accurate electrical rate analysis quickly and professionally while reducing manual calculation errors and saving estimation time. What You Will Get Inside The Electrical Rate Analysis Excel...

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

Social Media