Skip to main content

Rate Analysis of PCC Work

Rate Analysis of Cement Concrete (M15) 




General Format


Rate Analysis of Cement Concrete (M15) – DAR 2023 (Item 4.1.3)

As per Delhi Analysis of Rates (DAR), Volume–01, 2023 | Page 152

Afroz Civil presents a ready-to-use Excel Rate Analysis Template for Providing and laying cement concrete of grade M15 (1:2:4) up to plinth level, excluding the cost of centering and shuttering, strictly as per DAR 2023 Item 4.1.3.

The analysis includes material consumption, carriage, labour, equipment, water charges, and contractor’s overheads, making it suitable for BOQ preparation, RA billing, and running projects.

Concrete Grade: M15
Mix Ratio: 1 : 2 : 4
Unit: Per Cum
Derived Rate: ₹7,409.85 per Cum (Say) / ₹7,846.47 per Cum


Key Features

  • DAR 2023 compliant format

  • Detailed material, labour & equipment analysis

  • Auto-calculation in Excel

  • Yellow input cells for easy data entry

  • Suitable for tendering & site execution


⬇️ Download Excel Template

👉 Download Rate Analysis of Cement Concrete (M10) – Excel Sheet
Enter your site data and get instant results.

Price: ₹49 only (Single Sheet)
Enter your site data and get instant, accurate results.

Download Now


Note: Please enter all rates of materials, carriage, labour, and equipment as per current market rates for better accuracy.


All Rate Analysis Excel Sheets:


If You Find Rate Analysis of Cement Concrete M15 Helpful

Pay ₹69 only and get access to all Rate Analysis Excel Sheets including:

  • M -5 Grade of Concrete

  • M - 7.5 Grade of Concrete

  • M - 10 Grade of Concrete

  • M - 15 Grade of Concrete 

Practical, editable templates ready for site use.

Download Now


Afroz Civil
Practical Civil Engineering • Real Site Knowledge

Customer Support Desk- Click Here


Thanks

Afroz Civil Team

Comments

Popular posts from this blog

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

Electrical Rate Analysis Excel Toolkit – DAR & CPWD Based BOQ, Estimation & Costing Sheets

  Electrical Rate Analysis Excel Toolkit DAR & CPWD Based Electrical Estimation, BOQ & Costing Templates By Afroz Civil Practical Civil & MEP Engineering Knowledge The Electrical Rate Analysis Excel Toolkit is a professionally designed collection of fully automated Excel templates prepared for electrical estimation, BOQ preparation, costing, billing, tendering, and project planning work. These Excel sheets are developed using practical project requirements and are based on DAR & CPWD standards, making them highly useful for real electrical and MEP projects. This toolkit is specially designed for: Electrical Engineers MEP Engineers Quantity Surveyors Billing Engineers Contractors & Consultants Engineering Students Freshers Preparing for Jobs The toolkit helps engineers perform accurate electrical rate analysis quickly and professionally while reducing manual calculation errors and saving estimation time. What You Will Get Inside The Electrical Rate Analysis Excel...

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

Social Media