Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1)
Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1)
As per Delhi Analysis of Rates (DAR), Volume–01, 2023 | Page 205
Afroz Civil presents a ready-to-use Excel Rate Analysis Template for Reinforced Cement Concrete (RCC) of grade M20 up to plinth level, excluding the cost of centering, shuttering, finishing, and reinforcement, strictly as per DAR 2023 Item 5.1.
This analysis includes materials, carriage, labour, equipment, water charges, and contractor’s profit & overheads, making it suitable for BOQ preparation, RA bills, tendering, and running construction projects.
Concrete Grade: M20
Mix Ratio: 1 : 1.5 : 3
Unit: Per Cum
Derived Rate: ₹8,600 per Cum (Say)
Key Features
DAR 2023 compliant RCC rate analysis
Detailed breakup of material, labour & equipment
Auto-calculation in Excel format
Yellow-highlighted input cells for easy data entry
Ideal for site execution & estimation work
👉 Download Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1) – Excel Sheet as shown in above images.
Price: ₹49 only
Enter your site data and get instant, accurate results.
Note
Please enter all rates of materials, carriage, labour, and equipment as per current market rates for better accuracy.
Pay ₹59 only and get access to all Rate Analysis Excel Sheets including:
M -20 Grade of Concrete Excecl sheet Template
M -25 Grade of Concrete Excecl sheet Template
Practical, editable templates ready for site use.
Afroz Civil
Practical Civil Engineering • Real Site Knowledge
Customer Support Desk- Click Here
Thanks
Afroz Civil Team
.png)
Comments