Rate Analysis of RCC Work

Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1)



Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1)

As per Delhi Analysis of Rates (DAR), Volume–01, 2023 | Page 205

Afroz Civil presents a ready-to-use Excel Rate Analysis Template for Reinforced Cement Concrete (RCC) of grade M20 up to plinth level, excluding the cost of centering, shuttering, finishing, and reinforcement, strictly as per DAR 2023 Item 5.1.

This analysis includes materials, carriage, labour, equipment, water charges, and contractor’s profit & overheads, making it suitable for BOQ preparation, RA bills, tendering, and running construction projects.

Concrete Grade: M20
Mix Ratio: 1 : 1.5 : 3
Unit: Per Cum
Derived Rate: ₹8,600 per Cum (Say)


Key Features

  • DAR 2023 compliant RCC rate analysis

  • Detailed breakup of material, labour & equipment

  • Auto-calculation in Excel format

  • Yellow-highlighted input cells for easy data entry

  • Ideal for site execution & estimation work


👉 Download Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1) – Excel Sheet as shown in above images.

Price: ₹49 only 
Enter your site data and get instant, accurate results.

Download Now


Note

Please enter all rates of materials, carriage, labour, and equipment as per current market rates for better accuracy.




If You Find Rate Analysis of RCC (M20) – DAR 2023 (Item 5.1) Helpful

Pay ₹59 only and get access to all Rate Analysis Excel Sheets including:

  • M -20 Grade of Concrete Excecl sheet Template

  • M -25 Grade of Concrete Excecl sheet Template

Practical, editable templates ready for site use.

Download Now


Afroz Civil
Practical Civil Engineering • Real Site Knowledge

Customer Support Desk- Click Here


Thanks

Afroz Civil Team

Comments

Popular posts from this blog

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

Fire Fighting Rate Analysis Excel (DAR Based) | Wet Riser + Sprinkler

🔥 Fire Fighting Rate Analysis (DAR Based Excel Template) By Afroz Civil Complete Ready-Made Rate Analysis Template for Fire Fighting Systems Accurate rate analysis is one of the most critical tasks in any construction or MEP project. To simplify this process, Afroz Civil brings you a professionally developed Fire Fighting Rate Analysis Excel Template , fully based on Delhi Analysis of Rates (DAR) . This template is designed to help engineers prepare accurate, fast, and standardized rate analysis without the need for complex calculations. ⚙️ How This Template Works This Excel template is fully automated and user-friendly. ✔ What You Need to Do: Enter Material Rates Enter Labour Rates 🔄 What Happens Next: The final rate is automatically calculated instantly No manual formulas or calculations are required. 🚫 Important Instructions All material consumption constants are already fixed as per DAR standards All labour constants are predefined based on standard norms ❌ Do NOT modify cons...

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

Social Media