Skip to main content

How To Calculate The Weight of M.S Angle For Billing

How To Calculate The Weight of Mild Steel Angle For Billing


Derivation M.S Angle

*Mild Steel of  Equal Angles : 20 x 20 x 3 mm to 200 x 150 x 18 mm

Example for better understanding

Angle Size is 50  x 50 x 5 mm

*Unit weight of steel is 7850 Kg / m3

*Formula

Weight of Mild Steel angle is in Kg/m  

= Volume x Unit weight of steel.

Volume for

Part (i) = 1 x 0.050 x 0.005

= 0.00025 m3

Part (ii) = 1 x 0.045 x 0.005

= 0.000225 m3

Total Volume = 0.00025 + 0.000225 = 0.000475 m3

Weight of M.S angle

= Total volume x unit weight of steel

= 0.000475 x 7850

= 3.728 Kg/m

3.8 Kg/m

Same calculation for other dimensions of Mild Steel Angle.

 

Thanks for  reading this article. If you find this article helpful please, don’t forget to share and Subscribe Afroz Civil website and YouTube Channel for Latest Update.


I hope this check list points will be helpful for every site Engineer.

😍Join Our YouTube Channel Click here  

😍Join Our WhatsApp Group  Click here


I always Update helpful information and share my practical experience at this site.

Please Give your feedback in comment box.



Comments

Anonymous said…
Upon her launch, Sun visited several of} Las Vegas casino gift shops and acquired souvenir decks of enjoying in} playing cards. They look identical to those used at the gaming tables but have holes punched via their facilities to forestall cheaters from slipping a souvenir ace of spades, say, right into a poker recreation. Some had crisscrossing patterns that went proper to all 4 edges. The patterns on these playing cards, as a consequence of the manufacturing processes, were trimmed slightly a unique way|in another way} on prime and bottom, resulting in uneven margins of 1/32 of an 빅카지노 inch or much less. She spent round a thousand hours, over 4 years, coaching herself to recognize the minute variations on explicit playing cards. Sun figured out how she might leverage these variations that were almost imperceptible and acceptable by business standards.

Popular posts from this blog

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

BOQ – Bill of Quantity: Meaning, Steps, Format & Complete Guide | Afroz Civil

BOQ – Bill of Quantity: Complete Guide for Civil Engineers By Afroz Civil What is BOQ (Bill of Quantity)? A Bill of Quantity (BOQ) is a structured document prepared by a Quantity Surveyor or Estimator that lists every item of work along with its description, quantity, unit of measurement, rate, and total amount . It is developed based on approved drawings and project specifications and follows standard measurement methods. BOQ brings accuracy, clarity, and transparency to project costing and tendering. Objectives of BOQ To provide item-wise detailed quantities for all project components To offer a uniform basis for contractor bidding To ensure accuracy in estimation and tender comparison To avoid disputes during execution and billing To support interim and final bill preparation Applicable Standards BOQ preparation follows these major codes and references: IS 1200 – Method of Measurement of Building & Civil Works CPWD Works Manual & DSR Mo...

Social Media