Skip to main content

What is Chair Reinforcement in Building Construction ?


Chair Bar Guidelines for Reinforcement

Chair Bar Guidelines for Reinforcement (As per IS Code)

1. Purpose of Chair Bars

  • Chair bars are used to hold the reinforcement bars in position during construction to prevent displacement while pouring concrete.
  • They ensure the required spacing is maintained between the top and bottom reinforcement bars as per design specifications.

2. Spacing of Chair Bars

As per IS 456:2000 – Plain and Reinforced Concrete Code of Practice:

  • Chair bars should be spaced at nominal 1000 mm centers, unless specified otherwise.
  • For heavily reinforced slabs or where vibration may cause displacement, spacing can be reduced to 600-800 mm.

3. Diameter of Chair Bars

As per IS 2502:1963:

  • The diameter of a chair bar is recommended as hc/50, where hc is the clear cover.
  • The diameter should not be less than 12 mm.

4. Height of Chair Bars

  • The height of chair bars should correspond to the spacing between the top and bottom reinforcement layers.
  • Ensure the top reinforcement is not displaced during concreting by securely tying the chair bars to the reinforcement mesh.

5. Reinforcement Bars in Slabs and Rafts

As per IS 456:2000 – Section 26.5.2.1:

  • T1 & T2: Top reinforcement bars provided for tensile stress.
  • B1 & B2: Bottom reinforcement bars provided for flexural stress.
  • Clear Cover:
    • 20-25 mm for slabs.
    • 40-50 mm for rafts (depending on exposure conditions).

6. Checklist for Site Engineers

  • Ensure chair bars are placed at specified intervals and properly tied to the reinforcement mesh.
  • Verify diameter and height of chair bars comply with the structural design and IS code.
  • Inspect alignment and spacing of reinforcement bars before and after placing chair bars.

Additional Notes

  • Avoid using makeshift or improper chair bars to prevent uneven spacing.
  • For large-scale projects, consider pre-fabricated spacers for better precision and faster work.
  • Regular inspection ensures durability and strength of the structure.

If you found this article helpful, please share it and subscribe to Afroz Civil's website and YouTube channel for more updates.

Your feedback is valuable. Please share your thoughts in the comment box below.

Comments

draftwing said…

You have provided valuable data for us. It is great and informative for everyone.Read more info about architectural drafting melbourne Keep posting always. I am very thankful to you.

Popular posts from this blog

Rate Analysis Excel Sheet Download | AOR, SOR, DSR Templates – Afroz Civil

About Rate Analysis   Rate Analysis, Civil Engineering, AOR, SOR, DAR, Labour Output Constants, Construction Estimation, Costing, Billing, Material Cost, Machinery Cost, Afroz Civil Rate Analysis in civil engineering is a complete scientific method used to calculate the actual unit cost of construction activities. A proper rate analysis includes the breakdown of material, labour, machinery, overheads, contractor profit, taxes , and productivity norms. Accurate rate analysis ensures transparent billing , precise estimation , cost control , and efficient project management . It forms the foundation of the Analysis of Rates (AOR) and aligns with the Schedule of Rates (SOR/DAR) published by CPWD, PWD and State Engineering Departments. These codes help engineers maintain standard, uniform and technically correct cost calculations across all construction activities. Abbreviations Used in Rate Analysis: In this article, several important engineering abbreviations have been used, an...

IS 1200 All Parts (1 to 28) – Free Download PDF for Site Engineers & Billing

Method of Measurement IS Codes – Afroz Civil 👷 Introduction In civil engineering projects, measurement is the foundation for estimation, costing, billing, and project planning . Without a standard method, every engineer or contractor may interpret work differently. To remove this confusion, the Bureau of Indian Standards (BIS) published IS 1200 – Method of Measurement of Building & Civil Engineering Works . These codes ensure uniformity, transparency, and accuracy in construction measurement. Whether you are a Site Engineer, Billing Engineer, Project Manager, Contractor, or Client , IS 1200 is a must-have reference. At Afroz Civil , we have compiled the complete list of IS 1200 parts with free PDF download links so you can easily save them in your Laptop/PC and use them whenever required on site. 📚 IS 1200 – Method of Measurement (All Parts) IS Code Part Work Description Download Link (PDF) IS1200 Part 1 Earthwork Download PDF IS 1200 Part 2 Concr...

BOQ – Bill of Quantity: Meaning, Steps, Format & Complete Guide | Afroz Civil

BOQ – Bill of Quantity: Complete Guide for Civil Engineers By Afroz Civil What is BOQ (Bill of Quantity)? A Bill of Quantity (BOQ) is a structured document prepared by a Quantity Surveyor or Estimator that lists every item of work along with its description, quantity, unit of measurement, rate, and total amount . It is developed based on approved drawings and project specifications and follows standard measurement methods. BOQ brings accuracy, clarity, and transparency to project costing and tendering. Objectives of BOQ To provide item-wise detailed quantities for all project components To offer a uniform basis for contractor bidding To ensure accuracy in estimation and tender comparison To avoid disputes during execution and billing To support interim and final bill preparation Applicable Standards BOQ preparation follows these major codes and references: IS 1200 – Method of Measurement of Building & Civil Works CPWD Works Manual & DSR Mo...

Social Media